2024年8月9日
案例研究:
重新治理河流
In June 2013, heavy rainfall triggered catastrophic flooding in major southern Alberta rivers. The one-in-200-year flood exposed four of the natural gas pipelines on our NGTL System where they cross the rivers – creating a potential issue that needed to be addressed. The project team used a mix of soft engineering and bioengineering practices to “re-train” the river – essentially giving the river new engineering skills to help it do a different job, 同时最大限度地减少公司的环境足迹.
例如:
- 威尼斯电玩城游戏下载西蒙内特河管道修复项目, groynes were built to deflect water away from the river bank to prevent further erosion, channeling the flow of water to its original path so that debris and sediment would be deposited in the back eddies, thus reinforcing the eroding bank and establishing new habitat for fish.
- 在另一个项目中,威尼斯电玩城手游创建了一个通道内窗台. A trench was constructed downstream of the pipeline and filled with rock so that the depth of cover over the pipeline would increase as the river naturally picked up and deposited granular material at the sill.
阅读全文 to learn more about how our creative engineering solutions were successful on these water crossing projects.